The project has foreseen a series of interventions aimed at the complete architectural and plant requalification of the Building Complex located in Via Rivoltana in Segrate, in the province of Milan, with the aim of giving new impetus to a business center located in an area that has had in recent years a strong expansion. The project covered the following interventions:
- Facades remaking: the project, dominated by the colors of blue and blue, has accentuated the three-dimensionality of the façade, already characterized by surfaces and elements placed on different floors, through a system of roller blinds of different colors placed flush with the windows. A further layer has been introduced in the main façades, a structure made up of slender stainless steel rods that support a variegated pattern of glasses and stretched nets. The new structure has created an unprecedented image of the entire complex characterized by reflections, plays of lights and shadows that during the night hours continue to shine thanks to an integrated system of lights and LEDs on the glazed panels;
- External installations: the outdoor areas for green areas and parking areas have been redeveloped through new plantings of shrubs and trees and with a general reorganization of the spaces. The most important intervention was carried out covering the parking lot facing the main building in which the existing roof garden, not adequately enhanced, was completely redone, creating new paths and rest areas for use by users of the entire complex; moreover, two walkways were connected to the main building which allow to increase the use of the new garden;
- Fire adaptation project: a complete fire prevention adaptation of the common areas and of the plans for offices to comply with the safety requirements was carried out;
- Strip-out and interior spaces remaking: total removal of civil and plant components, reclamation and disposal of materials containing FAV detected in some spaces and realization of new civil and plant finishes. The project has replaced the traditional existing floor with a new raised floor while in the false ceiling the play of the dimensions and the recessed lights also helps to divide the spaces visually; the white color, which dominates the environment, creates an extremely bright work environment to which are added the blue and blue reflections of the glass on the façade.